OPS 571 WEEK 1 QUIZ Answers

  1. Poka-yoke is a Japanese term for a procedure that blocks an inevitable mistake from becoming what?
  • An unidentifiable waste
  • A service defect
  • A new process design flaw
  • A reason for overproduction
Complete Answers just a click away OPS 571 Week 1 Quiz Assignment
  1. For which key organizational functions are tasks and responsibilities identified for all the steps of the generic product development process?
  • marketing, operations, training, development
  • marketing, design, manufacturing, other
  • strengths, weaknesses, opportunities, threats
  • operations, quality, personnel, finance
  1. A service process design flowchart is referred to as a service blueprint to emphasize what?
  • The importance of process design
  • The impact of customer service
  • The impact of blueprints
  • The importance of system engineering
  1. Even though they use different models, both the Ritz Carlton Hotel Group and Nordstrom Department Stores are known for what?
  • The personal attention they provide their customers
  • A self-service approach to customer service
  • Customer facing employees who only talk to rich customers
  • Poor customer service
Want more details? Download now OPS 571 All Quiz Answers 
  1. According to the Service System Design Matrix, sales opportunity has what sort of relationship to production efficiency?
  • Direct Relationship
  • Equal Relationship
  • Inverse Relationship
  • No Relationship
  1. Which of the following is a good example of a continuous process layout?
  • A sit down restaurant
  • An automobile manufacturing plant
  • A home construction site
  • A gas refinery
  1. If an automotive service center has an issue with a car not being clean when returned to a customer, the pokayoke corrective action might include what?
  • Leaving the plastic on the seat when returning the car to the customer.
  • Leaving it up to the service tech who took care of the repair to determine if the car is clean
  • An inspection by the person returning the car before the car is seen by the customer.
  • Letting the customer make this determination
  1. Why is the planning phase often referred to as Phase 0 (Zero) of the generic product development process?
  • This phase is not necessary.
  • This phase is not completed until after the project has been funded.
  • This phase happens before the project is approved.
  • This phase requires $0 to complete.
Find the Quiz or Knowledge Check answers here OPS 571 Week 1 Knowledge Check 
  1. Using a project layout for building an aircraft, why would you want to place rivets close to or even in the fuselage?
  • Rivets are small and you don’t want to lose them
  • Rivets should actually be placed farthest away from the fuselage.
  • Rivets are used consistently throughout the construction process
  • Rivets are used one time only in the construction process
10. Why do many customers like the self-service approach to service design?
  • It provides the customer with the greatest amount of personal service.
  • It puts the customer in control
  • The customer is always right in this type of system.
  • It gives the customer more opportunity to steal from a company 
Click here to download OPS 571 Week 2 Quiz
11.  What happens to production efficiency as the customer exerts more influence on the system?
  • Production efficiency is decreased
  • Production efficiency is increased
  • There is no effect on production efficiency
  • Production efficiency is eliminated
Quiz Answers just a click away OPS 571 Week 1 Quiz Question Answers 
12. Permeable systems are characterized by being penetrable by customers via what two forms of contact?
  • Phone and face to face contact
  • Face to face and internet contact
  • Internet and mail contact
  • Internet and phone contact
13. What is a company trying to optimize in the most common approach to developing a work center layout?
  • Movement of material
  • Number of defects
  • Amount of required staff
  • Work shift hours
Final Exam Answers just a click away OPS 571 Final Exam
14. Some may argue that the production line approach may not treat the process as a service process, but as what type of process?
  • A marketing approach
  • A quality approach
  • An operational approach
  • A manufacturing approach
15. Why would a company want to supply a product to preferred customers during product ramp up?
  • Test the shipping process
  • Identify any remaining flaws
  • Get choice shelf positioning
  • Help develop a marketing plan 
About Author 
This article covers the topic for the University Of Phoenix OPS 571 Week 1 Quiz. The author is working in the field of education from last 5 years. This article covers the basic of OPS 571 Week 1 Quiz Assignment from UOP.
For further information on the above topics you can always visit the website www.StudentWhiz.com

OPS 571 Week 2 Quiz Answers

  1. In the pull system, which of the following is the partner that begins the process of pulling?
  • Vendors
  • Quality control personnel
  • Customers
  • Executive management 
Quiz Answers just a click away OPS 571 Week 2 Quiz
  1. Which of the following operations consulting tools are used in the cost impact and payoff analysis stage in the operations consulting process?
  • SPC tools and bottleneck analysis
  • Customer surveys and gap analysis
  • Decision trees and stakeholder analysis
  • Plant audits and statistical tools
  1. Which of the following production process terms best describes a stage in a multiple stage process that limits the capacity of the overall process?
  • Buffer
  • Starving
  • Bottleneck
  • Blocking 
Want help? Click to download OPS 571 Week 2 Quiz Answers
  1. Which of the following is a principle of reengineering?
  • Organize around the tasks
  • Capture information many times, at the source and where it is interpreted
  • Treat geographically dispersed resources as though they were centralized
  • Integrate the outcomes of parallel activities
  1. Which of the following operations consulting tools provide summary performance updates for specific processes and are generally presented in graphical form with color coding of trend lines and alarms?
  • Decision trees
  • Stakeholder analysis
  • Process dashboards
  • Responsibility charts
  1. Which of the following are possible examples of cycle times?
  • Time that a part waits in queue
  • Time it takes for an instructor to grade an exam
  • Time required to produce a batch of parts
  • Time to set up a new assembly line
  1. What is the term that refers to “the fundamental rethinking and radical redesign of business processes to achieve dramatic improvements in critical, contemporary measures of performance, such as cost, quality, service, and speed” (as cited in Jacobs & Chase, 2011, p. 461).
  • Reengineering
  • TQM
  • Operations consulting process
  • Continuous improvement
  1. Which of the following is a key metric associated with value stream mapping?
  • Defects per million operations
  • Lead time
  • Product demand
  • Fixed costs 
Find the Quiz or Knowledge Check answers here OPS 571 Week 2 Knowledge Check
  1. Which of the following is one of the major types of stakeholders impacted by most consulting projects?
  • Board of directors
  • International government regulators
  • Suppliers
  • Other consultants
10. Lean production seeks to achieve high volume production using which of the following?
  • Minimize utilization
  • Minimize inventory of raw materials
  • Maximize inventory of working process
  • Maximize capacity 
Find the final exam answers here OPS 571 Final Exam
11. In contrast to TQM, what approach seeks radical change through innovation?
  • JIT distribution
  • Project management
  • Reengineering
  • Lean manufacturing
12. In setting up a kanban control system, you need to determine the number of kanban card sets needed. If the average number of units demanded is 1,000 per hour, the lead time to replenish the order for this item is 10 hours, the container size is 5 units, and the safety stock is estimated to be 5% of the expected demand, what is the number of kanban card sets needed?
  • 210
  • 440
  • 1,050
  • 2,100 
Want more details? Download now OPS 571 All Quiz Answers
13. Which of the following is a situation that likely will yield economies of scale?
  • Large factory with dedicated capacity that is able to produce twice the number of units as locally demanded
  • Factory that fully utilizes dedicated resources for information technology, material handling, and administrative support
  • Company with factories in multiple countries that produces products for local demand
  • Factory that produces low volume, customized products
14. The basic notion of economies of scale assumes which of the following?
  • A piece of equipment with twice the capacity of another piece typically costs twice as much to purchase and to operate
  • Total cost of output drops as volume increases
  • Average cost per unit of output drops as a plant gets larger and volume increases
  • Two plants can be operated at the same cost as a single plant 
Complete Answers just a click away OPS 571 Week 2 Quiz Question with Answers 
15. To implement a flow process in developing a lean system, a firm might do which of the following?
  • Reduce setup/changeover time
  • Eliminate some fixed costs
  • Improve capacity utilization
  • Build product in anticipation of demand
16. An advantage of a make to stock process is which of the following?
  • All units of output are unique
  • Rapid delivery of a standard product
  • It responds directly to customer orders
  • It allows the firm to avoid inventory costs
17. According to Little’s law, which of the following can be used to estimate inventory?
  • Set up time times throughput rate
  • Process velocity times flow time
  • Process time times cycle time
  • Throughput rate times flow time 
Want help? Click to download OPS 571 Week 1 Quiz
18. Which of the following is a factor that causes a diseconomy of scale?
  • Increased utilization
  • Increased transportation costs
  • Increased total operating costs
  • Increased product value and prices
19. If the run time for a batch of parts is 25 minutes on a machine, and the setup time is 75 minutes, which of the following is the operation time?
  • 3 minutes
  • 25 minutes
  • 100 minutes
  • 75 minutes 
Click here and download OPS 571 Week 3 Quiz
20. Which of the following production process terms best describes the situation when activities in a stage of production must stop because there is no work?
  • Multiple stage processing
  • Starving
  • Blocking
  • Buffering
21. Which of the following terms refers to a special type of flowcharting tool that is valuable for the development of lean processes?
  • Kanban production control system
  • JIT production
  • Value stream mapping
  • Kaizen